检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学,江苏南京210098 [2]江苏沙河抽水蓄能发电有限公司,江苏溧阳213333 [3]华东勘测设计研究院,浙江杭州310000
出 处:《流体机械》2004年第12期14-18,共5页Fluid Machinery
基 金:水利部科技创新项目 (SCX2 0 0 1-13 )
摘 要:评述了目前抽水蓄能可逆机组常用的分段折线关闭规律 ;针对可逆机组独特的过流特性 ,设计了具有延时段的三段折线关闭规律 ,在减少总关闭时间的同时 ,有效的降低了抽水蓄能可逆机组由于导叶关闭与机组转速上升联合作用引起的水锤压力 ;介绍了考虑转速信号反馈的可逆机组导叶关机规律 ;为抽水蓄能可逆机组的事故紧急关机规律的设计提供了一种新思路。The broken-line closing law of reversible pump-turbine usually used in pumped storage plants is analyzed and discussed. Based on complete hydraulic characteristic of reversible pump-turbine, the broken-line closing law of three segments with delayed segment is designed. Water hammer pressure in pumped storage plant conveyance system caused by the closure of wicket gate and turbine rotation speed rise together is effectively decreased in the meaning time the total closure time is reduced. The wicket gate closing law of reversible pump-turbine with the rotation speed feedback signal is introduced also, a new idea for the design of the reversible pump-turbine sudden closing law is proposed.
分 类 号:TK7[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117