检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海岩土工程勘察设计研究院有限公司,上海200002
出 处:《工程勘察》2005年第1期7-9,14,共4页Geotechnical Investigation & Surveying
摘 要:采用静力触探资料估算单桩竖向承载力的方法经大量的工程实践证明是行之有效的 ,它可以充分发挥地基土的潜力 ,节省工程投资。但对于某些处于深厚软粘土中的桩 ,按规范规定的休止时间进行试桩时 ,实测的单桩极限承载力有时与理论计算结果相去甚远 ,本文结合具体工程实例详细说明了在工程中遇到此类问题的几种的处理措施 ,提出了此类地层中确定单桩竖向承载力的一些建议。From a variety of engineering practices it is proved that the method to determine the bearing capacity of single pile with CPT data is effective, which can fully make use of the potential capacity of subsoil so as to reduce the investment.When the pile-loading tests are carried out for the piles in deep soft clay according to the testing end time listed in national code,the bearing capacity from the testing has a great difference with the results from the calculation.Through engineering examples some measures to deal with such problems are presented, and suggestions on the determination of the bearing capacity of single pile is also given.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175