检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《同济大学学报(自然科学版)》2004年第12期1567-1572,共6页Journal of Tongji University:Natural Science
基 金:中国博士后科学基金资助项目 (2 0 0 3 0 3 42 79)
摘 要:将最优化计算理论引入到斜拉桥主梁的悬臂拼装计算中 ,采用 1阶分析法来确定斜拉桥的合理施工状态 ,用空间非线性有限元模拟了钢箱梁的悬臂拼装过程 ,求出各施工阶段节段的预抛高值 ,为某千米级斜拉桥的施工控制提供依据 .还讨论了该桥的主梁横联刚度及其对纵向主梁的弯矩的影响 .This paper introduces the optimization theory and method for the calculation of cantilever construction of girders. The first order optimization method is used to determine the rational construction state of a cable-stayed bridge.Using spatial nonlinear finite element method(FEM),the actual cantilever construction process of steel box-shaped girders is simulated,and the prearranged height of girders during construction is obtained. The results provide the basis for the construction control of a thousand-meter scale cable-stayed bridge.At the same time,the influence of the bending rigidity between transverse beams on the bending moment of lengthways girders in the finished dead state is discussed.
分 类 号:U443.38[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112