漫湾水电站大坝及厂房设计  被引量:1

Dam and Power House Design of Manwan Hydropower Station

在线阅读下载全文

作  者:王代禹[1] 罗世厚[1] 华代清[1] 

机构地区:[1]昆明勘测设计研究院

出  处:《水力发电》1993年第6期29-31,共3页Water Power

摘  要:漫湾水电站采用重叠式枢纽布置,大坝为混凝土重力坝,厂房为坝后跨越式,河床坝段厂坝连接采用“上分下连”的形式,主副厂房采用封闭的双跨板墙框架结构。The overlapped general layout was selected for Manwan hydropower station. The concrete gravity dam has connection with the power house located at the dam toe. The connection of the dam with the power house for the river dam section was made in such a way that the dam and the power house for the river dam section was made in such a way that the dam and the power house are separated on the top and joined in the bottom. Double-spanned closed slabwall frame structure was selected for the power house and auxiliary station.

关 键 词:漫湾水电站 混凝土重力坝 设计 

分 类 号:TV642.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象