检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐瑞春
机构地区:[1]长江水利委员会勘测总队
出 处:《水力发电》1993年第10期38-41,共4页Water Power
摘 要:根据大量地质工作,我们在隔河岩枢纽坝区建立了岩溶化河间地块存在非岩溶岩块的论点,并作出无岩溶管道渗漏的结论。对水库中上段滑坡集中分布的地区布置了周密的监测网。坝基地层为岩溶化程度很高的寒武系石龙洞灰岩,顺河断裂发育,并有多条剪切带,两岸还发育有多个岩溶通道系统,因而对坝基岩体、洞室和边坡稳定以及帷幕工程有重要影响。通过工作,对上述问题作了分析和预报,并提出了相应的处理建议。Based on nomorous geologic works, a new concept on non-carst rockmass exist in carst rockmass area without piping leakage has been developed. A monitoring network for some major and unstable landslids has been established. The foundation at damsite has high degree carst rockmass, developed faults and fractures as well as carst rock access at both banks. So it must affect the foundation, opening and slope stablity as well as curtain. This paper indicates the boundary condition of geologic model with control of foundation stablity, the route and minimum limitation of anti-seepage curtain, a forecast for leakage in the openings treatment proposals for the nature openings and slopes in outlet.
分 类 号:TV632.63[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15