检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林志祥[1] 朱岳明[1] 刘勇军[1] 徐之青[1] 曹为民[2] 吴健[2] 闪黎[2]
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]淮委治淮工程建设局,安徽蚌埠233001
出 处:《中国农村水利水电》2005年第2期75-78,共4页China Rural Water and Hydropower
摘 要: 经过初步计算、反分析计算和反馈计算对二河新泄洪闸施工期混凝土的温度和应力变化进行了数值仿真分析,并应用于指导施工,最终在水闸施工过程中没有出现肉眼可见裂缝。实践证明,只要施工方法合理,事先进行充分研究工作,完全可以实现不出现肉眼可见裂缝的防裂目标。Numerical simulation and analysis are conducted through preliminary estimate, reverse calculation, and feedback calculation of the concrete temperature and stress during the construction period of the new Erhe Sluice. The results are used to guide the construction, and no crack visible by naked eyes occurs in the construction process. It is proved by the application that as long as the method is rational and the work is studied fully, the goal of prevention of crack visible by naked eyes can be reached.
分 类 号:TV332[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30