检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李学勤[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2005年第1期1-4,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:沙坡头水利枢纽是黄河干流多泥沙河段的第一座灯泡贯流式水电站。因其以灌溉、发电为主综合利用 ,又地处腾格里沙漠边缘 ,河水含沙量较大 ,且电站接入的宁夏卫宁电网容量较小 ,高次谐波又较大 。Shapotou Water Control Project is the first bulb tubular hydropower station constructed on the main branch of Yellow River with a heavy sediment-load. Since the project is mainly used for irrigation and power generation, it is located on the edge of the Tenger Desert with a heavy-loaded river water, and also because of the less capacity and the greater upper harmonic of the Weining grid in Ningxia to be connected to this station, some outstanding difficulties and characteristics are brought to the electric and mechanic design of this power station.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15