检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国港湾建设》2005年第1期47-49,共3页China Harbour Engineering
摘 要:今后,国内外均有大量的建筑物达到甚至超过其设计使用年限,拆除后重建的工程项目将呈上升趋势,而国内外对此类问题尚无较详细的报道。通过巴基斯坦卡拉奇港OP- 旧高桩码头322根群桩基础的拔除施工,探索并总结出了一种成本费用较低、拔桩效率高的水上拔桩方法。From now onwards,there will soon be a lot of structures that come up to or even exceed their designed service life both at home and abroad.Rebuilding works after demolition of old structures will be on the increase and there hasn't been detailed reports on these works so far at home or abroad.In this paper,methods for extraction of piles on the water with low cost and high efficiency are explored and summarized on the basis of the experience in the works for extracting 322 piles in the group-pile foundation for the old OP-Ⅱ piled jetty in Karachi Port,Pakistan.
分 类 号:U656.113[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.238.74