纵横断面测量中转点的测设方法  被引量:2

Laying off Method of Turning Point in Vertical and Cross Section Survey

在线阅读下载全文

作  者:曾风山[1] 雷和健[1] 

机构地区:[1]湖南省地质测绘院,湖南衡阳421008

出  处:《地矿测绘》2004年第4期9-9,14,共2页Surveying and Mapping of Geology and Mineral Resources

摘  要:  通过作业实践认为,在纵横断面测量中,掌握灵活多样的转点测设方法,对提高工作效率至关重要。基于此,介绍了转点测设的基本方法;总结了以任意四边形、任意三角形进行转点测设的原理与方法;提出了利用欧氏几何原理,在已有控制点进行转点测设及复杂地形条件下测设的原理与方法;对CAD制图技术在转点测设过程中的应用进行了探讨。To hold multiform laying off methods of turning point is very important to work efficiency in vertical and cross section survey. Based on this, this paper introduces basic measuring method of turning points; sums the principle and method of turning point laying off with option quadrangle and triangle; brings forward the principle and method of laying off of turning point with Euclidean geometry principle under existing control point and under complicated topographic condition. Application of CAD map technique is discussed in process of laying off of turning point

关 键 词:纵横断面 转点测设 图形结构 CAD 欧氏几何原理 

分 类 号:P258[天文地球—测绘科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象