检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭少明[1] 黄强[1] 畅建霞[1] 籍勇晔[2]
机构地区:[1]西安理工大学水利水电学院,陕西西安710048 [2]黄河勘测规划设计公司,河南郑州450003
出 处:《水电能源科学》2005年第1期18-21,共4页Water Resources and Power
基 金:国家重点基础发展 (973 )项目 (G1 9990 43 60 8)
摘 要:以黄河水资源可再生性和可持续性发展为指导 ,确定了黄河流域多维临界调控的主要目标 ;将控制论、协同论、耗散结构理论引入水资源系统 ,提出了基于这三大理论的水资源系统多维临界调控方法 ;按照对复杂系统“从定性到定量综合集成”的研究思路 ,建立了黄河流域多维临界调控控制论仿真模型 ,对 2 1世纪黄河水资源调控进行了模拟研究 。Using the theory on recycle and sustainability of Yellow River water resources as the guideline, this paper puts forward this main objectives of Yellow River multi-dimension critical adjustment and control. The control theory, synergetic theory and dissipation structure theory were first introduced into water resources system and based on these theories, the multi-dimension critical adjustment and control theory of water resources system was put forward. According to the study method from the qualitative study to the quantitative integration for complex system, the authors established the multi-dimension critical adjustment and control model for the Yellow River, simulating the Yellow River water problem of 21st century with lots of sceneries and realizing the optimal allocation in order to achieve the sustainable development of Yellow River water resources.
分 类 号:TV211[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40