检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴杰芳
出 处:《长江科学院院报》1994年第3期50-57,共8页Journal of Changjiang River Scientific Research Institute
摘 要:本文介绍葛洲坝二泄泄水闸初步设计阶段对原设计方案闸墩的横向抗震性能进行的研究,即通过抗震模型试验研究闸墩结构空库和满库条件下的动力特性及地震响应;采用有限元法计算闸墩地震时程响应。一期工程建成后,又对泄水闸闸墩进行原型强迫振动试验,测定闸墩的动力特性,并且根据测得的动力特性参数对原型闸墩又进行了抗震验算。结果表明泄水闸闸墩在七度地震作用下是安全的,原型闸墩比原设计方案的抗震性能有显著改善。This paper presents a experimental study in which dynamic properties and earthquakeresponse under the empty and full reservoirs are obtained through anti-seismic model test. Earthquaketime response of the piers is calculated by using finite element method. After completing the first stageof the project,a forced vibration experiment in prototype was performed to determine the dynamicproperty of the piers and based on the dynamic proper ties obtained ,checking computation ofearthquake resistance was carried out on the pies in prototype. Results show that the sluice piers aresafe under the action of seven magnitude earthquake.The piers in prototype have a remarkablesuperiority over those in original design scheme in the field of aseismic performance.
分 类 号:TV66[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49