检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东师范大学河口海岸研究所
出 处:《地球科学进展》1994年第5期20-25,共6页Advances in Earth Science
基 金:国家自然科学基金
摘 要:分三个方面介绍了河口最大浑浊带研究中数学模拟研究的进展:(1)利用通量分析计算河口盐度、污染物和泥沙通量,分析带内泥沙富采机制;(2)由物质平衡原理建立一维和较简单的机理模型,讨论最大浑浊带的成因;(3)据水动力方程和物质平衡方程建立二维或三维数值模型,计算最大浑浊带的水流结构和物质浓度分布,模拟并探讨不同条件下最大浑浊带的成因和演化机制。In this paper,the advances of mathematical modeling of turbidity maximum in estuar-ies are introduced in three aspects:①To calculate salinity,contaminant and sediment con-centration with flux analysis method to study the mechanism of sediment amassing in estu-aries.②To establish one dimensional model or some simple model with mass balancingprinciple to explain the formation of turbidity maximum,③To establish two or three di-mensional numerical model with momentum and continuous equations to calculate the dy-namical feature and the distribution of mass concentration in estuary. Then analyse theformation and development laws of turbidity maximum under various assumptions.
分 类 号:TV148.1[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30