作 者:傅霞飞[1] 张正陵[1] 陈坚[1] 李继升[1]
机构地区:[1]华中电力集团公司动能经济研究所
出 处:《电网技术》1994年第5期23-27,共5页Power System Technology
摘 要:本文针对三峡水电站的建设,结合华中电网的中长期规划,计算分析了未来华中电网的短路电流水平及其变化趋势,并参照国外大电网建设和运行经验,提出了限制220~500kV电网短路电流的措施和方法,研究了三峡水电站分厂方式和接入系统方案对电网短路电流的影响,并提出了解决办法。According to medium and long term planning of Central China Grid(CCG)and construction program of ThreeGorges Hydroproject,in this paper analysed the future short circuit current(SCC)level and its developing tenden-cy of Central China Electric Network is analyzed.Taking foreign big grids construction and operation experience asreference,the authors put forward tneasures and rnethods of restriction on SCC in 220~500kV grids,made re-searches on connection of Three Gorges Hydroprojct to the CCG nad SCC's influence upon the CCG,and introducedthe ways of solving the problems mentioned in the paper.
分 类 号:TM727.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38