检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南师范大学长沙矿山研究院
出 处:《工程地质学报》1994年第3期81-90,共10页Journal of Engineering Geology
基 金:国家黄金总公司攻关项目
摘 要:本文充分利用地表及地下井巷揭露资料,配合物探成果推测深部水文地质条件。利用同位素^(18)O分析结果量化各种水体补给量,然后利用数值模型检验、校正上述成果,优选水文地质参数并进一步预测深部中段涌水量。考虑到模拟过程中某些未知因素,或未来开拓过程中工程措施的影响,本文对预测结果进行了必要的讨论和修订。The hydrogeological condictions of the deep rock at San shan island gold mine is examined from the observation data of exploratory wells and drift. The recharge water quantity from each water body(including sea water、salt water in the deep rock and fresh water in Quaternary deposits)is determined using the laboratory test on isotope 18O.Numerical model and nonlinear porgramming method are used to test and calibrate the previous examination results,and to determine hydrogeological paremeters.The mine water flow in the next digging operation is also predicated by numerical model.A sufficient numerical analysis,in which the deviation between practical and predicated water flows may exist due to some unknow information and different digging methods,is presented in this paper.
分 类 号:TD742.1[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30