检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工业建筑》1994年第10期39-40,55,共3页Industrial Construction
摘 要:望虞河立交上程是治理太湖的关键性的防洪控制工程,因其混凝土工程量大、工期短而采用集中搅拌、泵送浇筑混凝土施工工艺。为此,从几种混凝土外加剂的性能试验对比中,优选了AT缓凝高效减水剂增大混凝土的流动性能,达到顺利泵送的目的,并取得了较好的技术经济效果。The network of waterways progect of Wang Yu River is a critical preventing flood project for bamessing Tai Hu Lake.A construction technology of pumping concrete was adopted due to there are heavey concrete pouring and urgent time limit for the prozect.Therefore,a series of experiments on performances of several water-reducing admixtures were developed,and a optimun AT type set retarding and superplasticizer admixture was selected since its superior function for pumping aid, and a good technical economic results hare been achieved.
分 类 号:TV87[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222