天堂山水库拱坝初期蓄水监测成果  

Monitoring results of Tiantangshan arch dam during early stage of impoundment

在线阅读下载全文

作  者:陈婉瑜[1] 胡代清[1] 

机构地区:[1]广东省水利水电科学研究所,华中电业管理局

出  处:《人民长江》1994年第9期32-37,共6页Yangtze River

摘  要:天堂山拱坝是一座坝高约70米的双曲拱坝,为保证大坝安全蓄水,利用埋设在坝内的仪器观测系统和布置于坝基廊道的排水-扬压扎系统、选择部分控制蓄水安全的重点监测项目,进行了蓄水安全监控。初期蓄水监测结果表明:1.拱坝坝体温度变化规律,分布合理,其状态对大坝的应力和整体性有利;2.大坝的内部应力变化符合一般规律,量值、分布合理,变化均匀,出现的最大拉压应力符合现行规范;3.接缝灌浆质量良好,横缝未出现重被拉开现象;4.水平施工缝、坝基接触缝结合状态良好,坝体渗压力量值合理,变化正常,沿横向衰减较快;5.实测坝基扬压力不大,普遍低于设计允许值,坝基渗流量很小。根据监测资料和现场检查结果,得出初期蓄水期间大坝的运行性状正常,强度和稳定能满足水位抬高的安全要求。Tiantangshan arch dam is of double-curvature with a height of about 70m. In order to ensure its safety in impounding the reservoir,some important monitoring systems and items have been selected. They consist of the observation system embedded in the dam and the drainage-uplift holes system arranged in a gallery in the dam foundation. The monitored results in early stage of impoundment show:(1)The temperature variation and the temperature distribution are reasonable,and the temperatrue state is favorable to the stresses and the integrity of the dam;(2)The stress variation in the dam conforms to the general law The values of stresses and their distribution are reasonable and with a uniform variation the maximum tensile and compressive stresses occurring in the dam coinside with the present norm;(3)The quality of joint grouting is good and the transverse joints have not been re opened;(4)The horizontal work joints and the contact joints between the dam foundation and rock are well bound,and values of seepage pressures in the dam body are reasonable with their variation being normal and transverse attenuation being more rapid;(5)Observed values of uplifts in the dam foundation are generally less than the permissible designed values,and the seepage discharge is very small.According to the observed data and the investigated results in site,it.can be concluded that in the early stage of impoundment,the operational behaviours of the dam are normal,and the strength and stability of the dam can satisfy the requirements for raising the reservoir water level.

关 键 词:双曲拱坝 监测 水库 初期蓄水 

分 类 号:TV642.42[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象