检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]福建省水利水电勘测设计研究院
出 处:《水力发电》1994年第9期6-10,共5页Water Power
摘 要:南一水库大坝为混凝土重力坝,最大坝高96.8m。结合工程具体情况,采用全方位全历时动态温度控制,即区分坝体不同部位的施工环境和工作条件,如约束条件、气温、水温、湿度及应力状态等,进行适度的温度控制,取消了坝体纵缝。运行实践证明,取消纵缝的设计是成功的。Nanyi reservoir dam is a concrete gravity dam with maximum height of 96. 8m. In the light of actual project situations, adynamic temperature control was employed in all directions and in the whole Period of concreting. That is, according to construction environment and conditions of each part of dam body such as restriction conditions, atmosphere temperature, water temperature, humidity, stress, etc. the temperature was properly controlled to omit vertical joint of dam they. It has been proved by practical operation that dam design without vertical joint is successful.
分 类 号:TV642.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40