244.47mm套管试油井扫水泥悬空塞新工艺技术研究  被引量:1

Study for New Technology of Sweeping Cement Dangling Plug Testing in 244.47 mm Cased Well.

在线阅读下载全文

作  者:刘宝生[1] 吴德久[1] 李淑娟[1] 李有平[1] 夏朝君[1] 

机构地区:[1]吉林石油集团公司试油处,吉林松原138000

出  处:《油气井测试》2005年第1期60-61,共2页Well Testing

摘  要:经对244.47mm套管内用大钻头直接扫水泥悬空塞弊端剖析,得出在244.47mm套管内应用两次管柱扫水泥悬空塞的工艺技术优势,即应用钻塞管柱钻塞时,水泥钻屑量少,且可反循环洗井,大块钻屑可靠自重沉降,为今后大套管试油井扫水泥悬空塞提供了新的解决方案。To analyze shortage of sweeping cement dangling plug testing in 244.47 mm cased well with big bit, it is concluded that the technology of using two times of string to do it has much advantages, during drilling plug, are having less cement scraps and being reverse circulated making big drilling scraps to fall down for their weights that provides a new solution to sweep cement dangling plug testing in big cased well for the future.

关 键 词:悬空 试油 油井 套管 管柱 洗井 钻屑 优势 水泥 弊端 

分 类 号:TE973[石油与天然气工程—石油机械设备] TE273

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象