检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《岩土力学》2005年第3期450-454,460,共6页Rock and Soil Mechanics
基 金:教育部博士点基金资助项目(No.20030491004);教育部科学研究重点项目(No.03034)。
摘 要:锚拉桩是一种有效的治理滑坡的支挡结构,已广泛用于三峡库区库岸滑坡治理中。分析了锚拉桩应用于水库库岸滑坡治理工程中存在的关键问题。由于水库库岸滑坡作用在锚拉桩上的滑坡推力的变化,应考虑施加在锚索上的预应力 锚索与桩的协调变形,在不改变锚索预应力的情况下,增大锚索变形产生的水平拉力,将减少作用在锚索上的总拉力。通过一算例,分析了过大的预应力作用在锚拉桩上使锚拉桩处于不利工作状态。并分析了锚索上受到的竖向附加荷载,这将恶化锚索的受力,同时,锚拉桩在水位变动带存在三种预应力损失。The technique of cable-anchored piles is an effective measure in landslide control works, which nowadays has wide application to the fields of infrastructure such as transportation construction projects and geo-hazard control in the reservoir area of Three Gorges Project in China. However the design and calculating method concerned need more attention and urgent studies. Questions are put forward about the cable-anchored piles that have been applied largely in the landslide prevention in the Three Gorges reservoir shore lines. During computing the cable’s prestresses of cable-anchored piles, we consider the changes of horizontal sliding force that act on the anti-slide pile at different conditions and suggest a method for computing the prestressing force. In the method, the cable, anti-slide pile are regarded as a whole. We can increase the cable’s horizontal pull which is formed because of the cable’s deformation but keep the cable’s prestresses constant. By this method ,we can reduce the cable’s pull. The computation results show that excessive prestressing force acting on the anti-slide piles leads the anti-slide pile and the cable to be at a disadvantageous internal force condition. The prestressed anchors will get accessional vertical loads that deteriorate its internal force and three prestress losses exit in the prestressed anchors as the water level is changed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.116