检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海岩土工程勘察设计研究院有限公司
出 处:《上海地质》2005年第1期32-37,共6页
摘 要:上海市白龙港污水排放系统浦东工作井降水工程利用上海市二十多年的降水经验,采用非完整井理论,线性规划设计理念。尤其是在南浦大桥桥堍下,在上海市第一、二、三承压含水层相连通的含水层组中采取此种降水手段,科学设计、施工和管理降水工程保证了顶管前期工作的正常进行,既顺利地配合工作井开挖干封底,又保证了顶管出洞干施工的有效环境,同时还保障了周围环境的安全与稳定,取得了可观的社会、环境和经济效益。The dewatering engineering at Pudong working well bid site of eilong harbour in Shanhai.We take adventage of the dewaterin experiene for more twenty years in Shanghai to design the dewatering with the non-integrity well theory and linear programming ides.Esecially near the pier of Nanpu bridge and in the confined aquifers which the first,second and third confined aquifer have direct connection each other,dewatering is important to ensure the working well normally and push pipe early to carry out,including the excavation,the bottom,push pipe going out of the working well.At the same time,dewatering has also ensured the environment steady and safty.It has a role on the society,environment and economy.
关 键 词:白龙港 污水排放 降水工程 非完整井 线性规划设计 承压含水层
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117