检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:童中山[1] 须清华[1] 姜树海[1] 赵建钧[1]
出 处:《水利水电技术》2005年第3期35-37,共3页Water Resources and Hydropower Engineering
基 金:国家电力公司重点攻关项目"水电站导漂关键技术".
摘 要:在拦污和导漂设施的设计和运行中,漂浮物的运动和堆积形态是一个重要的考虑因素.水力模拟是解决该问题的有效方法之一.漂浮物相似模拟须从两方面考虑:漂浮物运动过程相似和漂浮物在坝前或导漂设施前的堆积形态相似.结合沙溪口水电站导漂设计,通过自编及运用一些通用软件对漂浮物在库区运动图片进行了矢量化处理,并对不同种类的漂浮物运动规律进行了试验研究.Motion and deposition status of the floating debris are very important factors to be considered during the design and operation of debris guiding structure; for which the model test is one of the effective methods to solve that of the problem. The simulation of the similarity for the debris can be considered from two sides: the similarity of the motion and the similarity of the deposition status in front of the dam or the guiding debris structure. Combined with the design of the debris guiding structure of Shaxikou Hydropower Project, photos made for the motion of the debris in the reservoir are vectorized into the vector files with some common programs including those developed by the authors, and furthermore, the motion laws of various floating debris are modeled and studied as well.
分 类 号:TV732.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28