三峡水库运用后荆江典型河段冲淤变化计算分析  被引量:15

Research on Variations of Typical Lower Jingjiang River Reach after Three Gorges Project Operation

在线阅读下载全文

作  者:董耀华[1] 卢金友[1] 范北林[1] 黄悦[1] 

机构地区:[1]长江科学院河流研究所,武汉430010

出  处:《长江科学院院报》2005年第2期9-12,共4页Journal of Changjiang River Scientific Research Institute

基  金:"九五"三峡工程泥沙问题研究项目;国家自然科学基金重大项目"洪水特性与减灾方法研究"资助(50099620)

摘  要:采用FLUVIAL 12模型,进行了三峡水库运用60a长江下荆江藕池口至监利河段冲淤变化预测计算,并讨论了FLUVIAL 12模型的适用性。计算分析表明:三峡水库运用后,藕池口至监利河段呈现先微淤、后冲刷、冲刷平衡后再缓慢回淤的冲淤过程和规律,最大冲刷量7.1~11.2亿t,出现在水库运用55a左右;监利、调关、石首3站枯水流量5000m3/s时水位下降3.13~4.71m,洪水流量30000m3/s时水位下降0.42~2.77m。Based on the imported FLUVIAL-12 Model, The developing tendencies for the Ouchikou-Jianli reach of the typical Lower Jingjiang River in regard to river channel aggradation and degradation, cross-sections configuration and feature stages within 60-year operation of the Three Gorges Project (TGP) have been predicted and analyzed by calculations. Results show that, within the 60-year TGP operation, the Ouchikou-Jianli reach will experience 4 sequent fluvial periods of subtle deposition, substantial degradation, transient equilibrium, and slow recovery, the maximum erosion amount is ((7.1)-(11.2)) 10~8t emerging around the fifty-fifth year, and the maximum stage lowering is (3.13)-(4.71 m) under discharge (5 000 m^3/s) and (0.42)-(2.77 m) under discharge 30 000 m^3/s respectively.

关 键 词:三峡水库 荆江 FLUVIAL-12模型 河道冲淤 河流最小能耗理论 

分 类 号:TV14[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象