公伯峡水电站工程枢纽总布置  被引量:2

General Arrangement of Gongboxia Hydropower Station

在线阅读下载全文

作  者:陈念水[1] 吴曾谋[1] 李玉洁[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2005年第1期26-29,共4页Northwest Hydropower

摘  要:公伯峡水电站工程为黄河干流龙羊峡~青铜峡河段第一座混凝土面板堆石坝,坝高、库大,地质条件十分复杂。设计中考虑了地形、地质、水文及施工条件,枢纽布置紧凑、合理;根据建筑物开挖料的质量,合理设置坝体分区,节省投资;应用新技术将导流洞改建成旋流消能泄洪洞。The Gongboxia Hydropower Station is the first concrete face rockfill dam (CFRD) from Longyangxia to Qingtongxia reach on the upstream Yellow River, with a high dam, a large reservoir and complicated geological conditions. Considering topography, geology, hydrology and construction conditions, the project is compactly laid out. According to the quality of excavated material, the dam zoning is properly set so as to save cost. New technique is applied to reconstruct the diversion tunnel to the vortex flow tunnel with energy dissipation.

关 键 词:枢纽总布置 混凝土面板堆石坝 右岸引水发电系统 泄洪洞 溢洪道 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象