检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2005年第1期26-29,共4页Northwest Hydropower
摘 要:公伯峡水电站工程为黄河干流龙羊峡~青铜峡河段第一座混凝土面板堆石坝,坝高、库大,地质条件十分复杂。设计中考虑了地形、地质、水文及施工条件,枢纽布置紧凑、合理;根据建筑物开挖料的质量,合理设置坝体分区,节省投资;应用新技术将导流洞改建成旋流消能泄洪洞。The Gongboxia Hydropower Station is the first concrete face rockfill dam (CFRD) from Longyangxia to Qingtongxia reach on the upstream Yellow River, with a high dam, a large reservoir and complicated geological conditions. Considering topography, geology, hydrology and construction conditions, the project is compactly laid out. According to the quality of excavated material, the dam zoning is properly set so as to save cost. New technique is applied to reconstruct the diversion tunnel to the vortex flow tunnel with energy dissipation.
关 键 词:枢纽总布置 混凝土面板堆石坝 右岸引水发电系统 泄洪洞 溢洪道
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.191