检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周恒[1] 李玉杰[1] 张文江[1] 王卫国[1]
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2005年第1期39-42,共4页Northwest Hydropower
摘 要:公伯峡水电站泄洪建筑物布置采用了两岸分散、左岸相对集中的平面布置格局,立面上采用表、深孔相结合的分层孔口布置,设置了开敞式岸边溢洪道、深式压力泄洪洞以及采用开敞式进水口的水平旋流泄洪洞。泄洪建筑物布置格局合理、型式多样、运用灵活,妥善解决了泄洪建筑物泄洪、排沙、放空、检修、施工期放水等运用要求。同时水平旋流消能泄洪洞在国内的首次应用,丰富了泄洪建筑物的型式,为导流洞的永久利用提供了新的经验。The water release structures of the station are located on both banks, with an arrangement of surface orifices and low level outlets, open-bank spillway, lower level outlet and horizontal vortex flow tunnel. The water release structures are reasonably laid out, easy to operate with various types, and solve the problems in light of flood release, sediment flushing, water empty, maintenance, and water discharge during the construction period. In addition, the horizontal vortex flow tunnel with energy dissipation is firstly used in our country, not only providing a new type of water release tunnel, but also furnishing another selection of diversion tunnel to be permanently used.
关 键 词:公伯峡水电站 泄洪建筑物 布置与设计 溢洪道 深孔泄洪洞 旋流泄洪洞
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31