检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南交通大学地下工程系,成都610031 [2]浙江省交通厅,杭州310004
出 处:《岩土力学》2005年第4期612-616,共5页Rock and Soil Mechanics
摘 要:采用三维有限元法,对连拱隧道软弱围岩洞口段进行了施工全过程数值模拟分析,得出了施工全过程地层位移的大小与分布规律,并用几何比1/20的相似模拟试验进行验证和补充,提出了该类隧道施工全过程的地层位移规律和施工中应重点关注的区域,对实际工程进行直接指导,并为同类工程提供参考。Based on a certain multiple arch tunnel project, the magnitudes and distributed regularities of stratum displacements have been attained through the numerical simulation analysis for the whole construction process of 40 m-length entrance section using 3D FEM, which is proved and given some necessary supplements through model test with the natural scale of 1:20. Therefore, the stratum displacements regularities and the key-attention zones during the whole construction process are put forward, which will have the direct guidance for the actual engineering works and reference for the similar project as well.
分 类 号:U459[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28