卫42块整体压裂改造方案研究  被引量:3

RESEARCH ON RECONSTRUCTION PLAN OF INTEGRAL FRACTURING IN WEI 42 AREA

在线阅读下载全文

作  者:乔廷立[1] 李健萍[1] 朱凤阁[1] 周伟勤[1] 肖勇[1] 张家根[1] 

机构地区:[1]中原油田分公司井下特种作业处

出  处:《钻采工艺》2005年第2期35-39,113,共5页Drilling & Production Technology

摘  要:卫4 2块自1985年上报探明储量以来,一直因构造、储层分布复杂,产能较低而做为难动用储量区块,经过十几年的勘探实践,尤其通过1997年的滚动勘探,该块的构造特征和油水关系已较清楚,目前已实施开发方案。由该块过去试油成果认识到,若要提高该区油井产能,必须实施压裂改造,同时为配合该区块有条不紊地合理开发,必须对该区进行综合研究,制定出合理有效的整体压裂改造实施方案。The Wei 40 zone is the reserves, which is difficult for producing, because of the complicated structure and reservoir distribution and lower capacity, especially through the rolling exploration in 1997. Now the production plan in the zone has been carried out. According to the production achievements for the past years, we recognized that if the well capacity in this zone should be enhanced, the fracturing reconstruction should be developed .To provide the reference for the yield increase and dependable crop in the zone, the reasonable and effective reconstruction plan of integral fracturing should be established.

关 键 词:卫42块 构造 压裂 方案设计 应用 

分 类 号:TE357.1[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象