检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭娜[1] 沈振中[1] 姜媛媛[1] 纪伟[1] 陈剑[2]
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]甘肃省水利水电勘测设计研究院,甘肃兰州730030
出 处:《水电能源科学》2005年第2期83-85,共3页Water Resources and Power
摘 要:根据初步设计布置方案,对海甸峡面板堆石坝及其高趾墙的工作性态进行三维有限元计算研究,详细分析了高趾墙的变形、应力等工作性态,论证了高趾墙设计方案的合理性。In the preliminary design stage,one scheme of Haidianxia Hydropower Station is that the concrete facing rockfill dam is parallelly arranged together with the concrete overflow gravity dam,in which a gravity high-toe wall with the height of nearly 50m is used,which is the highest one in China now. The stability and safety of the gravity high-toe wall is the key problem of the project. This paper performs a 3-D FEM calculation for the concrete facing rockfill dam and the gravity high-toe wall,analyzes the deformation and stress distribution of the gravity high-toe wall in detail,and researches the working behavior of gravity high-toe wall under design and check conditions. It is proved that the design scheme is reasonable and feasible.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145