检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丘文千[1]
出 处:《浙江电力》2005年第2期1-4,37,共5页Zhejiang Electric Power
摘 要:文章提出一个以系统电量不足期望值最小为优化目标的发电机组检修计划优化算法。算法主要由可行方案电量不足期望值计算和优化方案搜索2个部分组成。运用了改进的随机生产模拟方法计算电量不足期望值,并提出一个非常有效的启发式寻优方法,能满足工程实际应用。An algorithm is presented in this paper for the optimal generator maintenance scheduling based on the minimization of expected energy not supplied.The algorithm is composed of two parts mainly that one is the calculation of expected energy not supplied of actable schedules and the other is the progress of searching optimal schedules.An advanced stochastic production simulation model is used for calculating the expected energy not supplied.An effective method of elicitation is developed for searching the optimal schedules so that it can meet engineering applications.The usefulness and validity of the algorithm are ilˉlustrated by the case studies.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.202