检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团有限公司,湖北武汉430050
出 处:《桥梁建设》2005年第2期59-62,共4页Bridge Construction
摘 要:某座预应力混凝土连续箱梁受损后,梁体上产生大量的裂缝,且主梁刚度明显降低,通过加固设计,采取有效的加固施工方法,静动载试验,经过一段时期的通车运营表明该桥已恢复了原设计的承载能力。After the prestressed concrete continuous box girders of a bridge suffered damages, lots of cracks occurred in the girders and the rigidity of the girders also significantly decreased. With the design of strengthening and effective method for strengthening construction of the bridge, the bridge has been restored to its original designed carrying capacity as proved by the static, dynamic tests, and after a period of traffic operation.
关 键 词:预应力混凝土结构 连续梁 箱形粱 桥梁加固 施工监测
分 类 号:U445.72[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145