构皮滩水电站泄洪消能设计  被引量:4

Design of Discharge Dissipation For Goupitan Hydropower Station

在线阅读下载全文

作  者:胡中平 向光红 班红艳 

机构地区:[1]长江勘测规划设计研究院,湖北武汉430010

出  处:《贵州水力发电》2005年第2期30-33,共4页Guizhou Water Power

摘  要:构皮滩水电站坝址河谷狭窄、洪水峰高量大, 枢纽最大泄洪功率为42 000MW, 位居国内外高拱坝工程前列, 泄洪与消能防冲设计是本工程的关键技术问题之一。通过方案比选和水工模型试验研究, 推荐采用坝身孔口泄洪、坝下设置水垫塘消能、岸边设1条泄洪洞、采用预挖冲坑挑流消能的布置方案。The river valley at the dam site of Guopitan Hydropower Station is very narrow.The flow of its food pick is huge,its biggest discharge power is up to 42,000MW,more than ones of most high dams at home and abroad.Therefore,the design of discharge,dissipation and erosion control is one of the key technology problems of the project.Comparing several schemes and researching hydraulic model test,the layout scheme has been recommended that discharge is through orifices on the dam body and a spillway in the bank,cushion dissipater is set out under the dam,pre-excavating impact cavity and bucket dissipation are used.

关 键 词:构皮滩水电站 消能设计 水电站坝址 水垫塘消能 关键技术 消能防冲 试验研究 水工模型 布置方案 挑流消能 高拱坝 国内外 泄洪洞 工程 河谷 洪水 枢纽 坝身 坝下 岸边 冲坑 

分 类 号:TV642.42[水利工程—水利水电工程] TV652.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象