检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江大学审计处,湖北荆州434023 [2]长江大学后勤集团,湖北荆州434023
出 处:《长江大学学报(社会科学版)》2005年第1期96-98,共3页Journal of Yangtze University(Social Sciences Edition)
摘 要:根据工程量清单计价模式的特点,业主应从三个阶段采取相应措施加强工程造价的控制:在招标投标阶段,编制完善的招标文件和准确的工程量清单,评审投标报价的合理性,进而确定合同价的计价方式;在工程施工实施阶段,严格合同管理和工程变更签证管理;在工程竣工结算阶段,严格按合同和签证审核竣工结算,从而强化对工程造价的控制。Based on the characters of quoting according to the bill of quantity of a project, the proprietors shall take measures to control the project price at following stages, such as calling the bit and tendering, creating a perfect document for bidding, working out a precision project bill, evaluating the rationality of quoting, consequently to determine the quoting mode of the contract. During the project implementation, strict managements of the contract and visa of the project variation are necessary. During the process of the project completion and settlement of accounts, strict auditing of the completion is conducted according to the contract and the visa,in order to strengthen the control of project quoting.
关 键 词:工程量清单计价模式 工程造价控制 业主 工程竣工结算 投标阶段 招标文件 投标报价 计价方式 实施阶段 工程施工 签证管理 工程变更 合同管理 合理性 合同价 编制 审核
分 类 号:F299.233.3[经济管理—国民经济] TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.223