检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学土木学院岩土工程研究所,南京210098
出 处:《辽宁交通科技》2005年第4期9-12,共4页Liaoning Communication Science and Technology
摘 要:考虑到在路基填筑过程中,其自身固结引起的地基沉降和位移,如果不对其及时处理,将会影响到施工结束后的沉降和位移,而造成在运营期间不必要的返修。所以在有限元对路基填筑可能引起的沉降和位移进行预测后,进行提前处理。首先通过实际的地质资料及进行相关的实验研究有限元数值分析所需要的参数,再通过有限元分析法预测在填筑路基的过程中路基及地基可能产生的沉降及位移。In the process of subgrade filling,its consolidation would cause the settlement and displacement of foundation.If not eliminated in time,the phenomena will lead the subgrade to settlement and displacement after complition of construction,having the unnecessary repair.Thus,predicting the settlement and displacement potential in subgrade filling by finite element method,the paper conducts treatment ahead of time.First,there is fixing the parameters required for finite value analysis by way of geology data and relative experiments,then predicting the settlement and the displacement of subgrade,potential in filling of subgrade,by finite element analysis,guiding like this the construction going.
关 键 词:水平位移 路基沉降 分析预测 有限元数值分析 有限元分析法 路基填筑 地基沉降 实验研究 地质资料 填筑路基 运营期 前处理 行相关 施工
分 类 号:U416.1[交通运输工程—道路与铁道工程] TV698.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173