检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学,江苏南京210098
出 处:《南昌工程学院学报》2005年第1期60-62,共3页Journal of Nanchang Institute of Technology
基 金:教育部高等学校骨干教师计划基金资助项目(Z-1730).
摘 要:水位自记井滞后量计算理论是在假定为单管进水口的基础上考虑的,但在实际中的水位自记井大多是复管(多管)进水口,因此,在复管进水口条件下的水位自记井的滞后量计算理论有必要进行研究.从理论方面推导了复管水位自记井滞后量计算公式,考虑到公式的复杂性,采用当量管长法进行简化,并采用修正系数来修正由于简化引起的误差,在一定的范围内简化方法满足精度要求.;The computational theory of delayed quantity in well-logging of hydrographs is based on the hypothesis of singlepipe, but actually most well-logging of hydrographs has multipiple, so it is necessary to study its computational theory.This paper presents the theoretic formula of delayed quantity in well-logging of multipipe hydrograph. Considering the complexity of the formula, a method of equivalent pipe in length was used to simplify it.The error due to the simplification was modified by the coeficient of correction. By computating, the precision of the simplified formula could meet the requirement of application in given range.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28