机构地区:[1]水利部河北水利水电勘测设计研究院,天津300250
出 处:《水利水电技术》2005年第4期9-11,共3页Water Resources and Hydropower Engineering
摘 要:南水北调中线工程是国家一等供水工程,设计标准都很高,如大型建筑物按100年一遇洪水设计、300年一遇洪水校核,左右岸排水工程按50年一遇洪水设计、200年一遇洪水校核,渠道堤防工程按50年一遇洪水设计.中线总干渠沿线地形地质、水文气象复杂多变,在渠道设计的每个环节均应执行规范、坚持创新、精心设计.The Mid-route of the South-to-North Transfer Project is the national first-grade water supply project with high design standard. For example, the large scale structures are designed with 100years-flood and checked with 300years-flood,and the drainage projects designed with 50years-flood and checked with 300years-flood; furthermore, the embankments of the channel are designed with 50yeas-flood as well. As the geological and hydrological conditions along the channel are complicated, the design must be made with the specifications concerned strictly under the principle of “Persisting in technology innovation and enhancing project design level”.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15