检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京中关村开发建设股份有限公司,100016 [2]北京中关村开发建设股份有限公司总承包管理部,100016
出 处:《建筑技术》2005年第5期336-338,共3页Architecture Technology
摘 要:北京中关村科贸中心工程基坑占地约1.7万m2,基底深20m,水文地质和周边条件复杂。基础施工采用自渗为主、抽水为辅、抽渗结合的方案,利用管井和渗井相结合进行基坑降水,既满足了结构施工阶段无水作业的要求,又达到了保护地下水资源、保障周边建筑物稳定并防止地面沉降的效果。In Beijing Zhongguancun Science, Technology and Trade Center Project, the foundation pit has a plot area of about 17,000 m2 and a depth of 20 m with complicated hydro-geological and surrounding conditions. A combined dewatering plan, i.e. mainly by seepage, complementarily by pumping, was adopted in the foundation construction and pit water was drained away by the combination of pipe well with seepage well. It can not only meet the dry operation requirement in structural construction stage but may also protect underground water resource, ensure the stability of the surrounding buildings and prevent ground settlements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28