检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市电力公司调通中心,上海200020 [2]崇明电力公司,上海202150
出 处:《华东电力》2005年第4期29-32,共4页East China Electric Power
摘 要:随着上海500kV网架结构的发展,受短路容量的限制,南桥、杨高、徐行、顾路等分区必将分片运行;500kV母线或联变的故障、三峡直流大功率的突然闭锁以及外高桥二期2×900MW机组的突然停运,均有可能造成上海电网电压稳定性的破坏。介绍了上海电网电压稳定目前存在的问题,分析并提出了配置动态无功装置的可行性建议。With the development of the 500 kV network in Shanghai and because of the limitation of short-circuit capacity, the districts such as Nanqiao, Yanggao, Xuhang and Gulu are bound to operate separately. The fault in 500 kV busbars and coupling transformers, the sudden lockout of the Three Gorges direct power and the sudden shutdown of the 900 MW units of Waigaoqiao No.2 Power Generation Co., Ltd. would probably result in the voltage instability in Shanghai Power Grid. The currently existing problems in voltage stability of Shanghai Power Grid were introduced and the feasibility suggestion on configuring dynamic reactive equipments was put forward and analyzed.
分 类 号:TM714.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229