南水北调中线京石段应急供水工程左岸排水设计  被引量:4

Design of drainage works on left bank of emergency water supply project: Mid-route of South-to-North Water Transfer Project

在线阅读下载全文

作  者:靳沾[1] 宋宝生[1] 王海英[1] 

机构地区:[1]水利部河北水利水电勘测设计研究院,天津300250

出  处:《水利水电技术》2005年第5期42-43,45,共3页Water Resources and Hydropower Engineering

摘  要:南水北调中线工程京石段应急供水工程左岸排水建筑物是总干渠的重要组成部分,亦是解决左岸洪、沥水出路的关键工程,直接影响总干渠的安全通水.主要介绍了左岸排水建筑物规模确定、轴线选择、建筑物类型确定、进出口型式选择及布置、建筑物结构型式选择.The drainage works on the left bank of the emergency water supply project of Beijing-Shijiazhuang section on the Mid-route of the South-to-North Water Transfer Project are the important parts of the main channel and the key projects of the outlets for both the flood and the water-logging, which have the direct impacts on the safety of the water transfer in the main channel. For the drainage works, the decisions on the sizes, the axes, and the types are introduced, and then the selections of the types, the layouts for the inlets and outlets and the structure of the works concerned are presented as well.

关 键 词:南水北调中线工程 京石段 左岸排水工程 

分 类 号:TV674[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象