昆明站房高架候车厅室内热环境模拟及分析  被引量:2

Simulation and Analysis of the Indoors Thermal Environment in the High Elevated Waiting Hall of Kunming Railway Station

在线阅读下载全文

作  者:刘淑丽[1] 卢军[1] 罗留念 张红[1] 何晟[1] 黄海燕[1] 

机构地区:[1]重庆大学城市建设与环境工程学院,重庆400045 [2]广厦重庆第一建筑集团,重庆400030

出  处:《重庆建筑大学学报》2005年第2期76-79,共4页Journal of Chongqing Jianzhu University

基  金:国家自然科学基金资助项目(50278099)

摘  要:昆明站房高架候车厅长72.65m,宽39.4m,高8.85m。墙体四周设置大玻璃幕墙,屋顶设置采光带,夏季候车室存在过热的可能。通过PHOENICS软件对原设计情况及改进措施进行了数值试验,通过分析不同的四个方案得出在屋顶增加通风口;取消采光带;加大东墙门口面积。为最好的推荐方案,并用PHOENICS模拟出候车室内的温度场、风场的变化情况,推荐方案既可达到良好的室内通风又能保证室内温度低于27℃,完全可以满足候车室内人员活动要求。The high-elevated waiting hall of Kunming railway station is 72.65 meters long, 39.4 meters wide and 8.85 meters high. There are large glass curtain walls all around the waiting hall and on the roof there are day lighting lines. It is likely to be overheated in summer. The software PHOENICS is used to carry out a numerical test on the waiting hall under the original design condition and the improving measures, some advices are given. Through analyzing four different schemes, a solution is gained: increase the number of vents on the roof; cancel the day lighting lines; broaden the gate on east wall. It is the best one of recommended means. The thermal environment and the wind field of the waiting hall are also simulated. Not only the ventilation but also the indoor temperature lower than 27°C is guaranteed, which meets the requirements for the people is activity in the hall.

关 键 词:热环境 候车室 CFD 

分 类 号:TU441[建筑科学—岩土工程] X705[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象