三门峡水利枢纽工程生态影响后评价  被引量:16

Post-Project Ecological Analysis for the Sanmenxia Dam

在线阅读下载全文

作  者:郭乔羽[1] 杨志峰[1] 

机构地区:[1]北京师范大学环境学院水环境模拟国家重点实验室

出  处:《环境科学学报》2005年第5期580-585,共6页Acta Scientiae Circumstantiae

基  金:国家重点基础研究发展规划项目 (G19990 43 60 5 )~~

摘  要:为推动生态影响后评价的实施,完善水利水电工程的全过程环境管理,在阐述三门峡水利枢纽工程所在区域生态环境现状的基础上,度量了研究区的植被净第一性生产力以及气候生产潜力,分析了水生态环境特征的变化,以及研究区生物多样性和致灾因子在水库建成蓄水前后的不同特征.分析结果表明,水库的建设与运行对局部区域植被净生产力有一定影响。Although hydroelectric stations can generate great economic benefit and create chance of development, however, some irreversible changes in eco-environmental system can be caused by hydroelectric stations. Post-Project Ecological Analysis (PPEA) for hydroelectric stations is an important supplement to the subsistent environmental management for hydroelectric stations, which is contributed to assess the eco-environmental impacts of hydroelectric stations comprehensively and accurately. Sanmenxia Dam is the first large-scale hydroelectric station on the Yellow River. As the absence of eco-environmental impacts assessment for the project with the decision-making, some disadvantage changes in eco-environmental system had been caused. Based on the illumination of the present eco-environmental status of the area around the reservoir, the biological productivity of vegetation had been measured and had been compared with the production potential of climate. And the impacts on aquatic ecosystem, biodiversity and hazards were evaluated. The results showed that Sanmenxia Dam had impressed aquatic ecosystem and ecosystem function in local area.

关 键 词:生态影响 后评价 三门峡水利枢纽 黄河 

分 类 号:X826[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象