检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖木恩[1]
出 处:《矿业研究与开发》2005年第3期11-12,86,共3页Mining Research and Development
摘 要:在安庆铜矿120m高阶段大直径强化开采试验研究中,为优化矿柱回采顺序,研究矿柱回采过程中两侧充填体的稳定性,根据矿山实际情况,应用相似原理,进行了相似材料模拟实验。实验结果表明,矿柱回采顺序应从矿体中央向两翼间隔推进;回采过程中两侧充填体总体上是稳定的;回采后应及时对空区进行尾砂充填。In the experimental study of 120m high-level large-diameter long-hole mining at the Anqing copper mine, in order to optimize the sequence of mining pillars and research the stability of pillars on both the sides of fill during mining pillars, according to the practical conditions of the mine and similarity principle, the simulation experiment of mining had been carried out with similar materials. The experiment results indicated that the excavation of pillars should be stared at the center of the orebody and then simultaneously be progressed toward the each side of orebody to alternately extract the pillars; the fills on both the sides of pillar were stable during mining pillar; the mined-out space formed by excavating pillars should be filled in time.
关 键 词:大直径充填采矿 相似 模拟 矿柱 充填体 回采顺序
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15