安庆铜矿高阶段大直径深孔采矿相似材料模拟实验  被引量:4

Similar Experiment of High-Level Large-Diameter Long-Hole Mining in the Anqing Copper Mine

在线阅读下载全文

作  者:肖木恩[1] 

机构地区:[1]长沙矿山研究院,湖南长沙410012

出  处:《矿业研究与开发》2005年第3期11-12,86,共3页Mining Research and Development

摘  要:在安庆铜矿120m高阶段大直径强化开采试验研究中,为优化矿柱回采顺序,研究矿柱回采过程中两侧充填体的稳定性,根据矿山实际情况,应用相似原理,进行了相似材料模拟实验。实验结果表明,矿柱回采顺序应从矿体中央向两翼间隔推进;回采过程中两侧充填体总体上是稳定的;回采后应及时对空区进行尾砂充填。In the experimental study of 120m high-level large-diameter long-hole mining at the Anqing copper mine, in order to optimize the sequence of mining pillars and research the stability of pillars on both the sides of fill during mining pillars, according to the practical conditions of the mine and similarity principle, the simulation experiment of mining had been carried out with similar materials. The experiment results indicated that the excavation of pillars should be stared at the center of the orebody and then simultaneously be progressed toward the each side of orebody to alternately extract the pillars; the fills on both the sides of pillar were stable during mining pillar; the mined-out space formed by excavating pillars should be filled in time.

关 键 词:大直径充填采矿 相似 模拟 矿柱 充填体 回采顺序 

分 类 号:TD853.34[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象