检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李继胜[1]
出 处:《铁道工程学报》2005年第3期90-93,共4页Journal of Railway Engineering Society
摘 要:本文介绍了香港西部铁路电气化供电系统的概况,也介绍了牵引变电所和分区所的一次线和二次线设计情况,论述了其一次线和二次线方案的优缺点,对今后电气化牵引变电所和分区所的一次线和二次线设计提出了建议,对以后的电气化牵引变电所和分区所的设计有一定的参考意义。This article introduces the overview of the electrification power supply system of Hongkong West Rail and the preliminary and secondary connection in traction substation and sectioning post. The author describes the advantages and disadvantages of preliminary connection scheme and secondary connection scheme and also proposes the suggestion of preliminary connection and secondary connection design for electrified traction substation and sectioning post, which can provide some reference to future design of electrification traction substation and sectioning post.
分 类 号:U223.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90