永和大桥北岸沉井施工技术  被引量:2

Construction Techniques for North Bank Open Caisson of Yonghe Bridge

在线阅读下载全文

作  者:卓文泽[1] 庄波 余甦[1] 

机构地区:[1]广东省长大公路工程有限公司,广东广州510290 [2]广东省长大发展投资有限公司,广东广州510620

出  处:《世界桥梁》2005年第2期30-32,共3页World Bridges

摘  要:介绍了南宁永和大桥北岸沉井的施工。以单管高喷压旋喷形成帷幕墙,减少渗水量,以物探检测帷幕墙体缺陷的位置,避免了处理复喷的盲目性,实现了沉井的排水下沉,并阐述了该地质情况下沉井的下沉规律,对相似地质条件下的沉井施工具有一定的借鉴作用。The construction of the north bank open caisson of Yonghe Bridge in Nanning is presented. In the construction of the caisson, the single fluid, high pressure rotatory jet-grouting technique is used to form a curtain wall around the caisson pit to reduce water seepage, the geophysical prospecting technique is then used to locate grouting defects on the curtain wall to avoid blindness of repeated grouting, and consequently, to realize the smooth sinking of the caisson by dewatering. In the paper, the regularities of caisson sinking under the specific geologic conditions on the north bank side of the Bridge are described as well. The techniques herewith are supposed to be of certain reference to the construction of the caissons under similar geologic conditions.

关 键 词:沉井 施工技术 南宁永和大桥 物探检测 排水下沉 地质情况 借鉴作用 地质条件 帷幕墙 渗水量 体缺陷 盲目性 旋喷 

分 类 号:U445.55[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象