检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华南理工大学,广东广州510640 [2]广州市公路管理局,广东广州510080
出 处:《世界桥梁》2005年第2期51-54,共4页World Bridges
摘 要:在广州市内环路广佛出口放射线珠江大桥西桥的实际施工方案里,对制梁台座的位置作了后移,通过计算和分析,得出制梁台座后移这一变更对整个顶推施工过程的影响,并对制梁台座后移的施工方案的优点和不利之处作了归纳。In the actual erection scheme for Zhujiang River West Bridge on the radial roads at the exit Guangzhou to Foshan on the Inner Ring Road of Guangzhou City, the position of the girder precasting bed used for incremental launching construction of the Bridge is varied by shifting the bed backward. In this paper, the influences from variation of shifting the bed on the whole process of the incremental launching construction are analyzed through computation, and comments on both the advantages and disadvantages of the varied erection scheme are made as well.
关 键 词:制梁台座 顶推法施工 后移 江西 施工方案 市内环路 施工过程 放射线 大桥
分 类 号:U445.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222