顶推法施工珠江西桥时后移制梁台座的分析  被引量:1

Analysis of Influences from Shifting Backward Girder Precasting Bed During Incremental Launching Construction of Zhujiang River West Bridge

在线阅读下载全文

作  者:林俊锋[1] 王卫锋[1] 马文田 

机构地区:[1]华南理工大学,广东广州510640 [2]广州市公路管理局,广东广州510080

出  处:《世界桥梁》2005年第2期51-54,共4页World Bridges

摘  要:在广州市内环路广佛出口放射线珠江大桥西桥的实际施工方案里,对制梁台座的位置作了后移,通过计算和分析,得出制梁台座后移这一变更对整个顶推施工过程的影响,并对制梁台座后移的施工方案的优点和不利之处作了归纳。In the actual erection scheme for Zhujiang River West Bridge on the radial roads at the exit Guangzhou to Foshan on the Inner Ring Road of Guangzhou City, the position of the girder precasting bed used for incremental launching construction of the Bridge is varied by shifting the bed backward. In this paper, the influences from variation of shifting the bed on the whole process of the incremental launching construction are analyzed through computation, and comments on both the advantages and disadvantages of the varied erection scheme are made as well.

关 键 词:制梁台座 顶推法施工 后移 江西 施工方案 市内环路 施工过程 放射线 大桥 

分 类 号:U445.5[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象