机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2005年第2期33-36,共4页Northwest Hydropower
摘 要:三峡二期工程在上游围堰破堰进水前,发现在大坝上游面存在主要为竖向的裂缝,蓄水后将可能对大坝正常运行造成不利影响。裂缝处理的措施有:化学灌浆、嵌填止水材料、粘贴橡胶片、两侧及上下端防护。裂缝处理后,对施工质量进行了检测,布置了安全监测仪器,监测说明取得了良好效果。Prior to upstream weir breaking and water flowing into the foundation pit during the second stage works of Three Georges Project, it was found that there existed mainly vertical cracks on the upstream dam surface which might have adverse effect on the future normal operation of the dam upon impounding. Measures to treat cracks were taken such as chemical grouting, inserted sealing material, rubber waterstop, protection of both sides and upper/ lower ends. After treatment was carried out to the construction quality, and the safety instruments were arranged, which has achieved a good result.
关 键 词:三峡二期工程 泄洪坝段 厂房坝段 上游面 裂缝处理
分 类 号:TV698.231[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249