三峡二期工程大坝上游面裂缝处理  被引量:8

Crack Treatment of Upstream Dam Surface in the Second Stage Works of Three Georges Project

在线阅读下载全文

作  者:许正平[1] 李浚元[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2005年第2期33-36,共4页Northwest Hydropower

摘  要:三峡二期工程在上游围堰破堰进水前,发现在大坝上游面存在主要为竖向的裂缝,蓄水后将可能对大坝正常运行造成不利影响。裂缝处理的措施有:化学灌浆、嵌填止水材料、粘贴橡胶片、两侧及上下端防护。裂缝处理后,对施工质量进行了检测,布置了安全监测仪器,监测说明取得了良好效果。Prior to upstream weir breaking and water flowing into the foundation pit during the second stage works of Three Georges Project, it was found that there existed mainly vertical cracks on the upstream dam surface which might have adverse effect on the future normal operation of the dam upon impounding. Measures to treat cracks were taken such as chemical grouting, inserted sealing material, rubber waterstop, protection of both sides and upper/ lower ends. After treatment was carried out to the construction quality, and the safety instruments were arranged, which has achieved a good result.

关 键 词:三峡二期工程 泄洪坝段 厂房坝段 上游面 裂缝处理 

分 类 号:TV698.231[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象