马来西亚巴贡水电站进水口模型试验  被引量:3

Intake Model Tests for Bakun Hydropower Project in Malaysia

在线阅读下载全文

作  者:张晓莉[1] 王晓萌[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院工科院,西安710065

出  处:《西北水电》2005年第2期59-62,共4页Northwest Hydropower

摘  要:为了满足下游河道的生态需求,在电站进水塔前缘设置斜置的导水叠梁,通过调节导水叠梁的设置高度,使机组引用水尽量取自水库表层,保证引用水有足够的温度及含氧量。介绍了巴贡(BAKUN)进水口水力学模型及试验情况,分析了进水口前池的水流流速分布、水流流态,确定了导水叠梁的设置高度,并结合试验对不同工程设置导水叠梁的必要性进行了分析。To meet ecologic demand in the downstream channel, the tower-shaped chamber is set in front of the bellmouth intake, and the inclined training stoplogs are installed at the leading edge of the intake tower, it can take water from the surface of the reservoir for unit generation by regulating height of training stoplogs, in order to guarantee the water through units to have proper temperature and oxygen content. It presents the hydraulic model and test conditions of the intake for Bakun Hydropower Project, analyzes flow velocity distribution and flow condition in the forebay of the intake, determines the height of training stoplogs, and finally analyzes necessity of setting training stoplogs in accordance with tests for different projects.

关 键 词:电站进水口 水力学模型试验 导水叠梁 流速分布 含氧量 

分 类 号:TV131.61[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象