高水头水电站地下埋藏式钢岔管结构研究  被引量:7

Structural Study on Underground Bifurcation of Hydropower Station with High Pressure

在线阅读下载全文

作  者:吴海林[1] 伍鹤皋[1] 罗京龙[1] 杜鹏[2] 

机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]四川省水利水电勘测设计研究院,四川成都610072

出  处:《水电能源科学》2005年第3期57-59,64,i005-i006,共6页Water Resources and Power

摘  要:结合某高水头水电站工程的实际,采用了一种考虑初始缝隙的埋藏式钢岔管有限元分析方法,即将围岩简化为在有限元节点上施加纯压缩弹性抗力的模型,对钢岔管与围岩联合承载结构进行了有限元计算和分析,计算结果表明,围岩对钢岔管应力的影响和减小钢板厚度的效果十分显著。In accordance with the practice of a hydropower station with high pressure, finite element method is used to analyze the stress and deformation of an underground steel bifurcation with gap existing between bifurcatio n and surrounding rock, in which the rock is considered to evoke elastic reactions to the bifurcation. The FEM analysis result of underground bifurcation indicates that rock has a great effect on bifurcation stress and can therefore reduce the thickness of the bifurcation.

关 键 词:水电站 地下埋藏式岔管 联合承栽 初始缝隙 有限元法 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象