检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴海林[1] 伍鹤皋[1] 罗京龙[1] 杜鹏[2]
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]四川省水利水电勘测设计研究院,四川成都610072
出 处:《水电能源科学》2005年第3期57-59,64,i005-i006,共6页Water Resources and Power
摘 要:结合某高水头水电站工程的实际,采用了一种考虑初始缝隙的埋藏式钢岔管有限元分析方法,即将围岩简化为在有限元节点上施加纯压缩弹性抗力的模型,对钢岔管与围岩联合承载结构进行了有限元计算和分析,计算结果表明,围岩对钢岔管应力的影响和减小钢板厚度的效果十分显著。In accordance with the practice of a hydropower station with high pressure, finite element method is used to analyze the stress and deformation of an underground steel bifurcation with gap existing between bifurcatio n and surrounding rock, in which the rock is considered to evoke elastic reactions to the bifurcation. The FEM analysis result of underground bifurcation indicates that rock has a great effect on bifurcation stress and can therefore reduce the thickness of the bifurcation.
关 键 词:水电站 地下埋藏式岔管 联合承栽 初始缝隙 有限元法
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30