检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南石油学院,四川成都610500
出 处:《管道技术与设备》2005年第3期7-8,11,共3页Pipeline Technique and Equipment
摘 要:在天然气集输管网布局优化过程中,由于井式和集气站最大处理量的限制,可能导致集气站建造数量增加,从而造成管网系统的经济性差。综合考虑管道与集气站建造费用的关系,建立了井组划分的模型,并提出了相应的计算方法。结果表明,能够较好地解决上述问题。During the optimal process of gathering and transferring the natural gas pipeline network, the limitation of the well-type and the maximum throughput of gas gathering station will probably lead to building move gas gathering stations and increase the investment of the pipeline network system, resulting in a poor economic efficiency of the pipeline network system. Considering the relationship between pipeline and the construction investment of gas gathering stations,set up well division models and brought forward a homologous calculation method,which could be used to solve the problem mentioned above.
分 类 号:TE862[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28