“戽底设窄缝混合消能”在桥巩水电站低坝的应用  被引量:4

Application of Combined Energy Dissipation by Setting Narrow Bottom Seam in the Low Dam of Qiaogong Hydropower Project

在线阅读下载全文

作  者:罗秉珠[1] 陈龙[1] 吴小斌[1] 伍杰添[1] 刘亚辉 刘平昌 张绪进 

机构地区:[1]广西电力工业勘察设计研究院,广西南宁530023 [2]重庆西南水运工程科学研究所,重庆400016

出  处:《红水河》2005年第2期1-4,11,共5页Hongshui River

摘  要:收缩式消能工与挑流、底流、戽流相联合的消能方式,在高坝上已获得广泛应用,最近将其应用到中坝上,也取得良好效果。红水河桥巩水电站低坝,作了把收缩式消能工用在低坝戽式消力池里进行混合消能的尝试,水工模型验证结果表明,同样取得显著的消能效果,还使消力戽具有自我清理推移质的能力。<Abstrcat> The energy dissipation by combining contracted type and ski-jump, bottom current and bucket type have been widely used in high dam projects, and its recent application in medium height dam projects also has good effects. For the low dam in Qiaogong hydropower station, a hydraulic model test is done by applying the contracted type and bucket type combined dissipation. The test result not only indicated an obvious energy dissipation effect, but also a self-cleaning capacity of the bucket against bed load.

关 键 词:收缩式消能工 混合消能 戽式消力池 消能效果 水工模型 桥巩水电站 

分 类 号:TV653.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象