国产引进型300MW机组对两班制调峰的适应性分析  

Analysis of 300 MW Units Adaptability to Two-shift Operation

在线阅读下载全文

作  者:刘树华[1] 李今朝 张冬 

机构地区:[1]华北电力大学动力工程系,河北保定071003 [2]定州发电厂,河北定州073000 [3]一五○电厂,河北涉县056400

出  处:《电力科学与工程》2005年第2期24-26,共3页Electric Power Science and Engineering

摘  要:针对河北南网调峰能力和客观上的调峰需要之间矛盾十分突出的特点,提出引进型300 MW机组应该参与两班制调峰。从设备情况和运行实践两方面,证明了引进型300 MW机组基本具备两班制调峰的能力。针对河北南网,拟定了两种调峰方案,并比较了其经济性,结果表明引进型300 MW机组两班制调峰的方案具有更大的经济效益。Considering the contradiction between peaking operation ability and demand of Hebei Southern Electric Network, China made 300 MW units should take part in two-shift peaking operation. The ability of both equipment structure and operation practice of this type unit is shown. Two peaking operation schemes for the electric network are proposed and compared with their economical efficiency. It is concluded that two-shift peaking scheme has more economic benefit.

关 键 词:河北南网 引进型300 MW机组 两班制调峰 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象