检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学动力工程系,河北保定071003 [2]定州发电厂,河北定州073000 [3]一五○电厂,河北涉县056400
出 处:《电力科学与工程》2005年第2期24-26,共3页Electric Power Science and Engineering
摘 要:针对河北南网调峰能力和客观上的调峰需要之间矛盾十分突出的特点,提出引进型300 MW机组应该参与两班制调峰。从设备情况和运行实践两方面,证明了引进型300 MW机组基本具备两班制调峰的能力。针对河北南网,拟定了两种调峰方案,并比较了其经济性,结果表明引进型300 MW机组两班制调峰的方案具有更大的经济效益。Considering the contradiction between peaking operation ability and demand of Hebei Southern Electric Network, China made 300 MW units should take part in two-shift peaking operation. The ability of both equipment structure and operation practice of this type unit is shown. Two peaking operation schemes for the electric network are proposed and compared with their economical efficiency. It is concluded that two-shift peaking scheme has more economic benefit.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7