检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伟[1] 吴海林[1] 伍鹤皋[1] 孙海涛[2] 费文秉[2]
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072 [2]国电公司西北勘测设计研究院,西安710065
出 处:《岩土力学》2005年第7期1136-1140,共5页Rock and Soil Mechanics
摘 要:基于三维有限元法,对刘家峡水电站扩机工程调压井结构进行了静力、反应谱分析及非线性有限元分析,评价了结构的荷载效应。首先根据线弹性有限元分析结果,采用拉应力图法对调压井衬砌结构进行了配筋;然后以考虑混凝土开裂的非线性有限元方法校核结构强度和裂缝宽度。通过调整配筋面积,提出了适合于该水电站扩机工程调压井结构的最优结构型式和配筋方案。Based on three-dimensional finite element method (FEM) , the static analysis, spectrum analysis and nonlinear analysis of the structure of surge chamber of Liujiaxia hydropower station have been carried out. Load effects are evaluated. In accordance with the results of linear finite element analysis, a design scheme of reinforcement is proposed. Then, the strength of the structure and crack width are checked by using the nonlinear FEM. After several times of adjusting steel bars area of the structure, an optimal structure and corresponding reinforcement are obtained.
分 类 号:TV313[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222